Kishorn Port & Dry Dock

KPL is a multi use site suitable for all energy sectors and the pending decommissioning market. All types of equipment can be trialled, constructed or decommissioned in low risk conditions within one of Europe’s largest Dry Docks. On site, there are established quarry and port facilities, shipping agency, stevedoring, cranage and transport facilities with self-discharge work vessels. All of the above also includes oil and gas, drilling rig life extension and upgrades and renewable projects.

The Dry Dock gates are 166m in length, one of the largest dry docks in Western Europe and there is up to 13m of water available at high tide. Due to its size, KPL can hold large floating structures for extensions, upgrades and decommissioning - making it one of the best sites in Europe within its field in terms of capacity and for future requirements in the oil & gas industry, renewables and aquaculture.

All enquiries welcome.

Tidal range

Highest Astonomical Tide (HAT) = +5.9m CD; Mean High Water Springs (MHWS)=+5.2CD; Mean High Water Neap (MHWN) =+3.9mCD. Mean Sea Level (MSL) = + 3.1CD; Mean Low Water Neaps (MLWN) = + 2.1m CD; Mean Low Water Springs (MLWS) = + 0.6m CD; Lowest Astronomical Tide (LAT) = 0.0m CD. Chart Datum at Kishorn is approximately 2.75m below OD Newlyn.

Max vessel dimensions port has accommodated

Beam - n/a
Draft - n/a
LOA - 200.00m

Relationship between Chart Datum and Ordnance Datum

3.10m

Heaviest load over quayside to date

200000 tonnes

Total quayside length

466.00m

Port Services

All stevedoring, cranage, warehousing, transport, vessels, tugs, pilotage, SPMTs on request.

Future Development Plans

KPL continues to progress with development plans for Kishorn Port, after its three year planning application was granted for the redevelopment of the site with full support from The Highland Council. Having planning permission already established is a tremendous open opportunity for potential developers who require a “shovel ready” site, and are looking to manufacture large concrete structures, facilitate the extension of life for large oil and gas structures or decommissioning.

Location

Kishorn Port & Dry Dock quayside facilities

Quayside Ref
Length (m)
Depth below CD (m)
Open area (m2)
Shed area (m2)
General load capacity (t/m2)
Heavy lift capacity (t/m2)
Primary Use
Kishorn Area 7
1300.00
3.00
200000.00
17000.00
25.00
25.00
General Products/ Berths
Kishorn Dry Dock
166.00
8.00
100000.00
n/a
200000.00
n/a
Oil, Gas & Decommissioning
Kishorn Piled Quay
90.00
3.00
100000.00
n/a
25.00
10.00
General Products/ Berths
Kishorn West Quay
80.00
3.00
100000.00
n/a
25.00
10.00
Stone